The very curvy timbers we had to work with required a fair bit of temporary bracing
-
The worm tank sited and plumbed in
-
Plumbing fo the toilet waste as bracing the main structure begins
-
Floor timbers and plumbing for the water supply to basin and toilet
-
Solid bracing of the main uprights to compensate for their curvature
-
-
Flattening off the floor joists
-
Stone steps constructed leading to the front of the building
-
Flooring and toilet go in
-
-
Roof structure begins
-
Main roof timbers in place
-
Trying the doors out for size
-
Roof boarding goes on
-
-
Starting to weave the wattle (Acacia) for the walls
-
-
Daubing begins with a mixture of clay and dried grasses
-
-
-
End window (made from the bottoms of 5-litre wine bottles) installed
-
Daubing almost complete
-
Doors fitted
-
Doors glazed and oiled
-
Bracken thatch for the roof to protect the plastic
-
Finished toilet with the worm tank further downslope

December 5, 2021