Archive for March, 2013

Another roof

Thursday, March 28th, 2013

I’ve been keeping deliberately quiet about the work we’ve been doing over the last month or so as it was a surprise for daughter number 2 who’s been in the UK for college interviews (and yes, she was accepted). Now she’s back in Portugal and has been duly surprised, I can at last post about our progress.

This time last year, we built a roof on the back of the main building as part of a strategy to keep the building dry. The dry-stone schist buildings on the quinta, as with most buildings of this kind in this area, are built straight onto bedrock with the ground-floor rooms cut out of the rock itself. As a result, preventing or otherwise dealing with rainwater runoff following the bedrock into the buildings is necessary before these buildings can become habitable.

This year, it was time to give the second building on the quinta a similar treatment.

The smallest building before work started

(more…)